Posts

Showing posts from March, 2019

TTSP Employees Left the Building

Image
By: Vance Madelo    It was one clear, sweltering start of summer, in the closing days of February 2019 when all of TTSP’s operations had to stop. All data processing units were down and unplugged from power sources. The once bustling building of mouse clicks and key taps had completely turned into a different sound and scene. The occupants were clothed differently that time. They didn’t wear uniforms. They were dressed something else, because for two days they wouldn’t be designing and they wouldn’t be in their usual business activities. They came in simple clothes to pack their things. Obviously, TTSP was on to something – something bigger, and people from the workplace had to leave. The realization of a plan that took more than a year in the making finally came – the ground was dug and it took another year to put the structure into fruition. It was quite a long wait. Thus, on the 5th of March 2019, the workforce celebrated with a simple but heartwarming occasion of blessing